📢Purple Line MRT from Tao Poon to Krunai on 30 September 2024 as reported on 8 October 2024 :⚙🚝🥳
0. Overall Civil Works is 42.18% done to be finished in December 2028 and opened in December 2029
1. Contract 1: Tunnels and subway stations Tao Poon - National Library by CKST Joint Venture + PL : 56.85 % done
2. Contract 2: Tunnels and subway stations National Library - Phan Fah by CKST Joint Venture + PL : 48.21 % done
3. Contract 3: Tunnels and subway stations Phan Fah - Memorial Bridge near Ban Khaek intersection by Italian Thai Development PCL - NWUR MRT : 38.43 % done
4. Contract 4: Tunnels and subway stations Memorial Bridge near Ban Khaek intersection - Dao Khanong by Unique Engineering and Construction PCL : 40.14 % done
5. Contract 5: Elevated tracks and 7 Elevated stations Dao Khanong - Krunai along with Maintenance Center along with Park and Ride by Italian Thai Development PCL : 20.84 % done
6. Contract 6: Platelaying by Italian Thai Development PCL : 32.49 % done
🟣 Heavy Rail Transit total distance of 23.63 km with 17 stations including 14.29 km subways with 10 subway stations 🚇 and 9.34 km elevated track with 7 stations 🚆
🟣 4 Park&Ride buildings on both sides of Bang Pakok and Rat Boorana
🌳 Cement Hydrolic used in this project on 30 September is 198,525.98 metric tons 35.45% of about 560,000 metric tons.
🌳 This has effectively cut down the carbon dioxide equivalence by 10,323.351 metric tons
🌳 This is equal to growing trees of 1,086,668 trees
https://www.facebook.com/MRTPurplelinesouth/posts/511555948327587
Purple Line South Update: Elevated Track Installation Near Big C Bang Pakok (October 2024)
Construction progress continues on the Purple Line South! Here's an update on the elevated track installation near Big C Bang Pakok.
Contract 5 (Dao Khanong - Kru Nai): This section, running from Dao Khanong to Kru Nai, involves constructing an elevated track along the median of Somdet Phra Chao Taksin Road and Suksawat Road. It includes 7 elevated stations: Dao Khanong, Bang Pakaeo, Bang Pakok, Pracha Uthit Intersection, Rat Burana, Phra Pradaeng, and Kru Nai.
Current Progress:
* As of the end of September 2024, construction progress for Contract 5 reached 20.84%.
* The contractor, Italian-Thai Development Public Company Limited, is currently focusing on casting pillars and installing elevated track segments on the median strip of Suksawat Road in front of Big C Bang Pakok.
Overall Project Progress:
* The entire Purple Line South project (Tao Poon - Rat Burana) spans 23.6 kilometers, with 13.6 kilometers underground (10 stations) and 10 kilometers elevated (7 stations).
* As of the end of September 2024, overall construction progress has reached 42.18%.
MRT Purple Line Tunnel Excavation at Saphan Phut Yod Fa Station (October 2024)
The underground station design for Saphan Phut Yod Fa station is the first on the Thonburi side, located beneath Prachathipok Road, before Ban Khaek intersection. It serves as a connecting station between Sam Yot Station on the Phra Nakhon side and Saphan Phut Yod Fa Station on the Thonburi side.
Progress for Contract 3 (Phan Fa to Saphan Phut section) in September 2024 shows civil engineering work at 38.43% completion. The Mass Rapid Transit Authority of Thailand (MRTA) announced that ITD-NWR MRT Joint Venture, responsible for the design and construction of the tunnel and underground stations for the MRT Purple Line project (Tao Poon - Rat Burana segment, including the Kanchanaphisek Ring Road), has found it necessary to extend traffic diversion measures on the outbound lanes near Phra Pok Klao Bridge to the Centenary Celebration Memorial (Wong Wian Lek). Additionally, the traffic flow on the inbound side of Saphan Phut Bridge will be redirected to the outbound side to prepare the area for tunnel excavation at Saphan Phut station. This will occur between October 17 and December 31, 2024.
Saphan Phut station, with four entrances, will be the first station on the Thonburi side after crossing under the Chao Phraya River.
The Purple Line South subway project in Bangkok has made significant progress, with over 2 kilometers of tunnels excavated.
* Tunnel Boring Machines (TBMs): The project utilizes 7 TBMs across different sections. TBM 1 has already broken through Sri Yan station and is heading towards the National Library station. TBM 2 is nearing the ventilation shaft between the Parliament and Sri Yan stations. A third TBM is being installed and will start operations in November 2024, boring from the National Library station to the Democracy Monument station.
* Progress: The overall project is approximately 40.38% complete. The underground section of the Purple Line South is 14.29 kilometers long and runs at a depth of about 41 meters.
* Completion: The project is expected to be completed and open for service by the end of 2028.
Rat Burana Station: Clearing Land Along Suk Sawat Road to Build Parking Building for MRT PURPLE LINE (Oct 2024)
Construction of Rat Burana Station is underway. The station will be located next to the expressway on Suk Sawat Road, where it intersects with Khlong Chaeng Ron. There will be two park-and-ride buildings along Suk Sawat Road, one on the outbound side and one on the inbound side, with a capacity of 1,384 cars. Construction is being carried out by Italian-Thai Development Public Company Limited, the contractor for Contract 5, covering the section from Dao Khanong to Khru Nai. As of September 2024, civil works are 20.84% complete.
Currently, construction of the station's entrance/exit and the parking building is in progress.
The station will be an elevated station with two entrances and exits:
* Entrance/Exit 1: Located on the outbound side in a vacant area of an industrial factory next to Khlong Chaeng Ron. It will have stairs, escalators, and elevators connecting to the parking building on Suk Sawat Road's outbound side.
* Entrance/Exit 2: Located in a vacant area near Khlong Chaeng Ron. It will have stairs, escalators, and elevators connecting to the parking building on Suk Sawat Road's inbound side.