Manila Metro Lines (Under Construction Network)
Line-7: North Avenue San Jose del Monte
Total Length: 22.8 km
Stops/Stations: 14
Stations: Quezon North Avenue Joint station, Quezon Memorial Circle, University Avenue, Tandang Sora, Don Antonio, Batasan, Manggahan, Dona Carmen, Regalado, Mindanao Avenue, Quirino, Sacred Heart, Tala, and San Jose del Monte.
#RailwayNews Mindanao Railway Project Advances Despite Funding Challenges
President Ferdinand Marcos Jr. has directed the continuation of the Mindanao Railway Project (MRP) despite funding challenges. The Department of Transportation is exploring alternative funding sources, including Official Development Assistance. Initially proposed as diesel-powered, the project may switch to electric trains. The first phase, costing PHP81.6 billion, will start in Davao, Tagum, and Digos.
https://www.facebook.com/railfansphilippines/posts/301118366413821
วิดีโอนี้เกี่ยวกับสถานี Angeles ของ PNR NSCR (North South Commuter Railway)
วิดีโอเริ่มต้นด้วยการขอบคุณพระเจ้าสำหรับการนำทางและมุ่งหน้าไปยังสถานี Angeles ผู้พูดกล่าวว่าสถานี Angeles มีระยะทางที่ไกลที่สุดระหว่างสถานีบนทางรถไฟ Malalos [0:01 - 0:40]
ผู้พูดแสดงการก่อสร้างสถานี Angeles กำลังสร้างโครงสร้างเหล็กและวางคาน ผู้พูดกล่าวว่าการก่อสร้างดูเหมือนจะล่าช้า [0:41 - 1:21]
#RailwayNews LRT1 Extension to Bacoor Faces ROW Issues; Construction of Final Stations to Start in Two Years
The construction of the final three stations of LRT1's extension to Bacoor, Cavite, is set to start within two years, as the government resolves right-of-way (ROW) issues. Transportation Secretary Jaime Bautista announced that the Department of Transportation (DOTr) has secured 94% of the necessary ROW. The remaining stationsLas Piñas, Zapote, and Niogwill be constructed by Light Rail Manila Corp. (LRMC).
Phase 1 of the extension, adding five stations in Parañaque, is 98.2% complete and expected to begin operations by late 2024. Once fully operational, the entire extension will reduce travel time from Baclaran to Bacoor to 25 minutes and increase ridership from 500,000 to 800,000 passengers daily.
https://www.facebook.com/railfansphilippines/posts/305575979301393
กู้เงินฟื้นฟู BICOL Railway มูลค่า 175,000 ล้านเปโซ จาก ธนาคารเพื่อการพัฒนาเอเซีย (ADB) และ Asian Infrastructure Investment Bank (AIIB) เพือฟื้นฟูทางรถไฟสายใต้ที่กะจะไปจาก Malolos ถึง Tutuban ปลายปี 2027 - ต้นปี 2028 should begin either by the end of 2027 or early 2028.
ส่วนทางรถไฟสาย NSCR มูลค่า 873,620 ล้านเปโซจากสนามบินนานาชาติคลากไป Calamba, ระยะทาง 147 กิโลเมตรจะลดเวลาเดินทางไปสองชั่วโมง